High-Pressure Piping

Installation of high-pressure steam piping and industrial boilers

Construction Standards

Installation of saturated steam piping conveying steam at 230°C and 25 bar operating pressure from central boiler room to finishing workshops. 100% butt weld joints inspected via radiographic testing (RT) non-destructive examination.