Project Introduction
Construction of clean water supply network and technical wastewater collection systems for Meiko's high-precision semiconductor component manufacturing facility, demanding absolute environmental safety and zero leak tolerance.
Scope of Construction
- Installation of over 4,200m of butt-fusion welded HDPE and internal lined steel piping.
- Automatic VFD booster pump station and industrial pressure-reducing valve system.
- Completed 10 days ahead of schedule.