{"id":38,"date":"2026-10-01T09:00:00","date_gmt":"2026-10-01T08:00:00","guid":{"rendered":"https:\/\/hs-easy.minhkhang.net\/hs-easy-hoan-thanh-lap-dat-he-thong-duong-ong-cong-nghiep-cho-nha-may-cnt3\/"},"modified":"2026-10-13T17:13:41","modified_gmt":"2026-10-13T10:13:41","slug":"hs-easy-hoan-thanh-lap-dat-he-thong-duong-ong-cong-nghiep-cho-nha-may-cnt3","status":"publish","type":"post","link":"https:\/\/hs-easy.minhkhang.net\/en\/hs-easy-hoan-thanh-lap-dat-he-thong-duong-ong-cong-nghiep-cho-nha-may-cnt3\/","title":{"rendered":"H&amp;S EASY completes installation of industrial piping system for CNT3 plant"},"content":{"rendered":"<p>H&amp;S Easy Company Limited has officially handed over and successfully completed the acceptance testing for the supply and return piping system serving the dyeing line at CNT3 Plant. All construction work was completed 5 days ahead of schedule, earning high praise from the client for weld quality and site safety.<\/p>\n<h2>Superior Workmanship Quality<\/h2>\n<p>Meeting rigorous client specifications for sanitary internal cleanliness and high-pressure ratings, the H&amp;S Easy technical team executed Argon purge root welding with 100% NDT inspection certification. All joints were polished and chemically passivated.<\/p>\n<blockquote><p>&#8220;We highly commend the responsibility, site discipline, and technical welding expertise demonstrated by H&amp;S Easy. This establishes a strong foundation for future strategic partnerships between our organizations.&#8221; &#8211; Representative of CNT3 Client stated.<\/p><\/blockquote>\n<h2>Uncompromising Safety Commitment<\/h2>\n<p>Throughout 45 days of non-stop construction, the H&amp;S Easy site safety steering board maintained 100% safe working hours with zero incidents or lost-time occupational safety injuries.<\/p>","protected":false},"excerpt":{"rendered":"<p>H&amp;S Easy Company Limited has officially handed over and successfully completed the acceptance testing for the supply and return piping system serving the dyeing line at CNT3 Plant. All construction work was completed 5 days ahead of schedule, earning high praise from the client for weld quality and site safety.<\/p>","protected":false},"author":0,"featured_media":87,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36],"tags":[],"class_list":["post-38","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc-cong-ty"],"_links":{"self":[{"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/posts\/38","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/comments?post=38"}],"version-history":[{"count":1,"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/posts\/38\/revisions"}],"predecessor-version":[{"id":65,"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/posts\/38\/revisions\/65"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/media\/87"}],"wp:attachment":[{"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/media?parent=38"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/categories?post=38"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hs-easy.minhkhang.net\/en\/wp-json\/wp\/v2\/tags?post=38"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}