Project Scope
Workshop fabrication, transportation, and on-site erection for a smart peripheral device manufacturing facility with over 25,000 m2 floor area. All steel structures received Sa 2.5 abrasive blasting surface preparation and premium 3-coat anti-corrosive epoxy paint.